These planned upgrades are designed to enhance road safety and improve infrastructure, ensuring smoother journeys in the long run.
National Highways is responsible for major roads and motorways, so smaller road closures will not be included in this schedule.
The A2 is a key route linking Dover with central London, stretching approximately 72 miles from Borough in the capital to the Dover Docks.
The A21 serves as a primary connection between London and Hastings, while the A20 is an essential link to Dover.
The A282 forms part of the crucial Dartford Crossing, a major route across the River Thames.
Drivers should allow extra time for their journeys and follow diversion routes where necessary.
Here are the full list of closures:
Monday, March 17
-
A2 Eastbound – Ebbsfleet entry slip road closure (8pm – 6am)
- Scheme details: A2 eastbound A2260 to Hall Road slip road and lane closure for maintenance works.
-
A2 Westbound – Junction M25 to M25 Clockwise Junction 2 Link road closure (8pm – 5am)
- Scheme details: Technology works, diversion via National Highways Network.
-
A20 Eastbound – Junction B2173 to Junction M25 carriageway closure (10pm – 5:30am)
- Scheme details: Surfacing works, diversion via local authority roads.
-
A21 Both Directions – A2100 to Westfield Lane carriageway closure (8pm – 6am)
- Scheme details: Surface works between Mountfield and Baldslow.
-
A21 Southbound – Pembury exit slip road closure (8pm – 6am)
- Scheme details: Tonbridge to Kippings Cross slip closure for maintenance works.
-
A282 Northbound – West Tunnel and Junction 1A entry slip road closure (9pm – 5:30am)
- Scheme details: Tunnel works, diversion via National Highways roads.
Tuesday, March 18
- A2 Eastbound – Coldharbour Lane exit slip road closure (8pm – 6am)
- A20 Eastbound – Junction B2173 to Junction M25 carriageway closure (10pm – 5:30am)
- A21 Both Directions – A2100 to Westfield Lane carriageway closure (8pm – 6am)
- A21 Northbound – Quarry Hill entry slip road closure (8pm – 6am)
- A21 Northbound – Vauxhall Lane to Morleys Road roundabout carriageway closure (8pm – 6am)
- A282 Northbound – West Tunnel and Junction 1A entry slip road closure (9pm – 5:30am)
Wednesday, March 19
- A20 Eastbound – Junction B2173 to Junction M25 carriageway closure (10pm – 5:30am)
- A21 Both Directions – A2100 to Westfield Lane carriageway closure (8pm – 6am)
- A282 Northbound – West Tunnel and Junction 1A entry slip road closure (9pm – 5:30am)
Thursday, March 20
- A2 Eastbound – Brenley Corner to Wincheap carriageway closure (8pm – 6am)
- A2 Westbound – Marling Cross entry slip road closure (8pm – 4am)
- A20 Eastbound – Junction B2173 to Junction M25 carriageway closure (10pm – 5:30am)
- A21 Both Directions – A2100 to Westfield Lane carriageway closure (8pm – 6am)
- A21 Northbound – Vauxhall Lane to Morleys Road roundabout carriageway closure (8pm – 6am)
- A282 Northbound – West Tunnel and Junction 1A entry slip road closure (9pm – 5:30am)
Friday, March 21
- A2 Eastbound – Brenley Corner to Wincheap carriageway closure (8pm – 6am)
- A21 Both Directions – A2100 to Westfield Lane carriageway closure (8pm – 6am)
- A282 Northbound – West Tunnel and Junction 1A entry slip road closure (9pm – 6am)
Saturday, March 22
- A2 Eastbound – Brenley Corner to Wincheap carriageway closure (8pm – 6am)
- A21 Both Directions – Scotney Castle Roundabout to Flimwell carriageway closure (8pm – 6am)
Sunday, March 23
- A2 Eastbound – Brenley Corner to Wincheap carriageway closure (8pm – 6am)
- A21 Both Directions – Scotney Castle Roundabout to Flimwell carriageway closure (8pm – 6am)