These planned works aim to improve road safety and infrastructure, with closures affecting key slip roads, carriageways, and tunnels.
Drivers are advised to prepare for possible disruptions as essential maintenance takes place, including resurfacing, structural improvements, and electrical works.
National Highways oversees motorways and major A-roads, meaning smaller road closures are not included in this schedule.
The A2 serves as a vital connection between Dover and the heart of London, spanning nearly 72 miles from Borough to Dover Docks.
Full List of Closures:
Monday, March 3
- A2 Eastbound – A296 entry slip road closed (8pm–6am) for electrical works between Bean and Ebbsfleet.
- A2 Westbound – Marling Cross exit slip road closed (8pm–6am) for survey work between Gravesend and M2 Jct 2.
- A20 Westbound – Courtwood carriageway closed between exit and entry slip roads (8pm–6am) for structural works.
- A21 Both Directions – A2100 to Westfield Lane carriageway closed (8pm–6am) for surface improvements between Mountfield and Baldslow.
- A282 Northbound – West Tunnel and Jct 1A entry slip road closed (9pm–5:30am) for tunnel maintenance. Diversions via National Highways roads.
- A282 Clockwise – Jct 1A to Jct 2 carriageway closed (10pm–5:30am) for resurfacing works. Diversions via local authority roads.
Tuesday, March 4
- A2 Westbound – Marling Cross exit slip road closed (8pm–6am) for continued survey work between Gravesend and M2 Jct 2.
- A20 Westbound – Courtwood carriageway closed (8pm–6am) for ongoing structural improvements.
- A21 Both Directions – A2100 to Westfield Lane carriageway closed (8pm–6am) for surface works between Mountfield and Baldslow.
- A282 Northbound – West Tunnel and Jct 1A entry slip road closed (9pm–5:30am) for tunnel maintenance. Diversions via National Highways roads.
- A282 Clockwise – Jct 1A to Jct 2 carriageway closed (10pm–5:30am) for resurfacing works. Diversions via local authority roads.
Wednesday, March 5
- A2 Westbound – Barham exit slip road closed (8pm–6am) for maintenance works between Dumrill Hill and Barham.
- A2 Westbound – Cobham exit and entry slip roads closed (8pm–6am) for survey works between Rochester and Singlewell.
- A20 Westbound – Courtwood carriageway closed (8pm–6am) for ongoing structural works.
- A21 Both Directions – A2100 to Westfield Lane carriageway closed (8pm–6am) for surface works between Mountfield and Baldslow.
- A282 Northbound – West Tunnel and Jct 1A entry slip road closed (9pm–5:30am) for tunnel maintenance. Diversions via National Highways roads.
- A282 Clockwise – Jct 1A to Jct 2 carriageway closed (10pm–5:30am) for resurfacing works. Diversions via local authority roads.
Thursday, March 6
- A2 Eastbound – Brenley Corner to Wincheap carriageway closed (8pm–6am) for resurfacing works.
- A2 Westbound – Cobham exit and entry slip roads closed (8pm–6am) for survey works between Rochester and Singlewell.
- A2 Westbound – Jct A2018 to Jct A223 carriageway and slip road closed (10pm–5am) for TfL cyclic maintenance. Diversions via local authority roads.
- A20 Westbound – Courtwood carriageway closed (8pm–6am) for ongoing structural works.
- A21 Both Directions – A2100 to Westfield Lane carriageway closed (8pm–6am) for surface works between Mountfield and Baldslow.
- A21 Southbound – Potters Wood exit slip road closed (8pm–5am) for resurfacing between Tonbridge and Pembury.
- A282 Northbound – West Tunnel and Jct 1A entry slip road closed (9pm–5:30am) for tunnel maintenance. Diversions via National Highways roads.
- A282 Clockwise – Jct 1A to Jct 2 carriageway closed (10pm–5:30am) for resurfacing works. Diversions via local authority roads.
Friday, March 7
- A2 Eastbound – Brenley Corner to Wincheap carriageway closed (8pm–6am) for resurfacing works.
- A20 Westbound – Courtwood carriageway closed (8pm–6am) for ongoing structural improvements.
- A21 Both Directions – A2100 to Westfield Lane carriageway closed (8pm–6am) for surface works between Mountfield and Baldslow.
- A21 Southbound – Potters Wood exit slip road closed (8pm–5am) for resurfacing between Tonbridge and Pembury.
Saturday, March 8
- A2 Eastbound – Brenley Corner to Wincheap carriageway closed (8pm–6am) for resurfacing works.
- A21 Both Directions – A2100 to Westfield Lane carriageway closed (8pm–6am) for surface works between Mountfield and Baldslow.