Engineering work will be taking place on Sunday (November 9) and will affect Southeastern train services.
Services will run as normal on Saturday (November 8).
We have broken down the details for you to plan ahead.
Sunday (November 9):
Engineering work is taking place in the Dartford area, closing some lines until 7.15am.
The 6.50am train from Dartford to London Charing Cross via Sidcup will start from Crayford.
A replacement bus will run between Dartford and Crayford, leaving Dartford at 6.34am.
The 7.02am train from Dartford to London Victoria service will start at Barnehurst.
A replacement bus will leave Dartford at 6.47am to connect with the train at Barnehurst.
Engineering work is also taking place between Dartford and Gravesend, closing some lines.
The 12.30am train from London Charing Cross to Gravesend via Sidcup service will be replaced by a bus between Dartford and Gravesend, departing Dartford at 1.27am

