A2, A21 and A282 maintenance is scheduled for this week, potentially causing delays and diversions for drivers.
These essential upgrades aim to enhance road safety and infrastructure across the region.
Motorists should prepare for potential delays and follow signposted diversions where necessary.
The A2, a vital 72-mile corridor linking Dover to central London, will be among the routes affected.
Here is a full list of confirmed closures and times:
Monday, August 18
- A2 eastbound from Adisham Road to Coldred Hill will be fully closed from 8pm to 6am for tree works.
- A282 northbound Dartford Crossing West Tunnel will be closed from 10pm to 530am for maintenance, with a diversion via the National Highways network.
Tuesday, August 19
- A282 northbound Dartford Crossing West Tunnel will be closed again from 10pm to 530am for ongoing maintenance.
Wednesday, August 20
- A2 eastbound Upper Harbledown exit slip road will be closed from 8pm to 6am.
- A2 eastbound Harbledown exit slip road will be closed from 8pm to 6am.
- A2 eastbound Dunkirk entry slip road will be closed from 8pm to 6am.
- A21 southbound Westerham entry slip road will be closed from 8pm to 4am for barrier repairs.
- A21 in both directions between Junction Road and the A28 at Baldslow will be closed from 9pm to 6am for council works.
- A282 northbound Dartford Crossing West Tunnel will be shut from 10pm to 530am.
- A282 southbound Junction 1A exit slip road will be closed from 10pm to 530am for road marking.
Thursday, August 21
- A20 westbound Courtwood exit slip road will be closed from 8pm to 5am for signage works.
- A21 both directions between Junction Road and A28 Baldslow will be closed from 9pm to 6am.
- A282 northbound Dartford Crossing West Tunnel will close from 10pm to 530am.
Friday, August 22
- A21 both directions between Junction Road and A28 Baldslow will be closed from 9pm to 6am.
There are no scheduled closures for Saturday or Sunday.